Recent Projects: Concrete and Tarmac Driveways

Concrete Driveways

Although no one project is ever the same, we pride our selves on our quality of work and attention to detail.

For all driveways we will dig out the area to a depth of at least 250mm/10inches.

We then insert drainage channels to designated soak aways. The area is then covered with one layer of tiram. We then cover that with 175mm/7inches OF M.O.T sub base aggregate. The sub-base layer is the main load-bearing layer of the paving / brickwork and it is designed to evenly spread the load of the paving.

Over the sub-base layer we then lay and screed 25mm/1inch of sharp sand and associated surrounding brick work prior to laying 100mm/4inches of concrete.